High-Speed Milling of Hardened Die Steel: Key Finishing Guidelines
High-speed finishing of hardened die steel with rigid solid carbide tools and TiAlN coated cutters

High-Speed Milling of Hardened Die Steel: Key Finishing Guidelines

When performing high-speed finishing on hardened die steel, one of the most important principles is to use shallow cutting parameters. The depth of cut should generally not exceed 0.2 mm for either axial depth of cut or radial depth of cut. Maintaining small cutting depths helps prevent excessive deflection of the tool holder and cutting tool, while also supporting tight tolerances and high machining accuracy.

It is also essential to choose a highly rigid clamping system and tool setup. When using solid carbide tools, tools with the largest possible core diameter should be selected to maximize bending stiffness. As a general rule, if the tool diameter is increased by 20 percent, for example from 10 mm to 12 mm, tool deflection can be reduced by approximately 50 percent.

Similarly, reducing the tool overhang by 20 percent can also reduce tool deflection by about 50 percent. Using a larger shank diameter or a tapered shank can further improve stiffness. When using a ball nose cutter with indexable inserts, a solid carbide shank can increase bending rigidity by three to four times compared with a less rigid setup.

For high-speed finishing of hardened die steel, it is also important to select the correct insert geometry and tool grade. In addition, coatings with high hot hardness, such as TiAlN, are recommended because they perform better under the high cutting temperatures generated during high-speed machining.

more insights

Product Design

Product Design Begin with good design   FPM has the unique ability to contribute value at every phase of your product development via our global

Read more >
Receive the latest news

Mid-Autumn Festival & National Day Holiday

Mid-Autumn Festival
September 25–27, 2026
Regular business resumes September 28.

National Day Holiday
October 1–7, 2026
Regular business resumes October 8.

We will be working normally from September 28–30.